G.E. Booth WWTP, Primary Clarifier Expansion
        Location: Mississauga, Ontario
ROMAG is currently constructing the Primary Clarifier Expansion & Miscellaneous Improvements at G.E. Booth Wastewater Treatment Plant in Mississauga. The project includes the addition of two primary clarifier tanks, sludge monitoring upgrades, a new effluent water pumping station, and three new aeration inlet feed channels. The work also includes a new primary influent channel that will consist of a primary inlet conduit extension, a common primary influent channel, primary feel channels, and an individual primary influent channel for each clarifier, as well as a new primary effluent channel with a secondary bypass weir gate. Two outfall chambers will also be added, with both connecting to the existing 2400mm Plant 3 outfall pipe. Additionally, the project contains the relocation of chlorination injection points to does into outfall chamber No.1
All Projects
Completed Projects
- 
                                                
                                                    
Airport Road Reservoir & Surge Building Expansion
 - 
                                                
                                                    
Alloa Reservoir and Pumping Station
 - 
                                                
                                                    
Caledon East Well #2 & #3 Pumping Station
 - 
                                                
                                                    
Caledon East Well #4 Pumping Station
 - 
                                                
                                                    
Clarkson Wastewater Treatment Plant, Contract 2-2 Solids Upgrade
 - 
                                                
                                                    
Dundas East Wastewater Pumping Station, Oakville, Ontario
 - 
                                                
                                                    
G.E. Booth (Lakeview) Aeration Tank Expansion
 - 
                                                
                                                    
G.E. Booth (Lakeview) Mercury Reduction System
 - 
                                                
                                                    
G.E. Booth WWTP, Ash Piping Replacement
 - 
                                                
                                                    
G.E. Booth WWTP, Primary Inlet Conduit Contract 1A
 - 
                                                
                                                    
Grimsby Water Storage System
 - 
                                                
                                                    
Lockview Combined Sewer Overflow Storage Tank
 - 
                                                
                                                    
Malton Four Corners Stormwater Pumping Station and Castlemore Wastewater Pumping Station Upgrades
 - 
                                                
                                                    
Nonquon Water Pollution Control Plant Expansion
 - 
                                                
                                                    
Smithville Reservoir and Pumping Station
 - 
                                                
                                                    
Tullamore Pumping Station & Reservoir
 - 
                                                
                                                    
Welland Water Treatment Plant Phase 1 Upgrades